Find the decision bottleneck

Follow the path from a changed concept through its controls and applications. Start where the next required piece of evidence is absent, disputed or out of date.

Go to guided case links

Follow one dependency

Start at the posting object in the impact lab. Follow the ledger WBS field to month-end close, then switch the evidence to Disputed. Inspect the source tied to the contested link and the owner who can route it for review.

Assign a next action

A missing assessment calls for a source and rationale. A disagreement on a required relationship calls for an assigned reviewer and recorded resolution. Confirmed evidence still goes through the applicable approval, quorum and CI requirements.

After activation, check whether the application gave the expected answer on an input where the old and new versions differ. Keep the approval and the observation as separate records.

Where has progress stopped?

Find the dependency owner

Collect a dated source. Record an assessor, rationale, criticality and confidence. Check whether the source covers the exact rule scope before proposing the change.

Send the exact claims to the reviewer

Preserve both judgments and their sources. For a required relationship, have the designated reviewer resolve the current basis and vote on the resulting candidate. Check that the sources are confirmed and the required quorum is met.

Check the application’s decision

Run the pre-agreed case that distinguishes versions. Bind the actual reading, capture time and artifact to the released version and application. A usable result is still required for verification.

Follow the workflow